Progress continues -- the third floor is now fully framed with a new bathroom, two skylight openings and a hatch for the roofdeck. It was a bit chaotic up there so I forgot to take a photo.
The HVAC guys were starting the duct work in the bedrooms as well as installing the heating and cooling systems in the attic.
The Plumber is nearing completion of the rough plumbing and is about ready for his first inspection.
HVAC Supplies
Maurice and two of the electricians going up to the third floor
Hot and cold water lines running up the walls!
And back in Charlestown, the packing has started. I've got about 20 boxes packed up so far and cringe when I think about how much more needs to be done!