A quick stop by the house for Isabelle and I and we saw lots of progress! The hardwood floors guys were there as well as a painting crew, and Maurice was still working on wainscot and trim. Could this house possibly be livable by Labor Day or are we back to a hotel when school starts??
The roof was edged with new cooper flashing.
Safety first! Although I just noticed in this photo the cigarette lighter on the ground next to the extinguisher.
Isabelle by one of the skylights on the third floor
Banister is in, but the spindles are not.
Standing on the third floor and looking down to the second floor landing. When the light is shining is the first floor.
Third floor shower (floor)
Third floor shower
Some of the trim work leading up to the third floor
Painting the master bathroom
Master bedroom -- the walls are a light gray and the ceiling is a dark gray
Mater Bedroom
Moulding in the second floor foyer
Stairway leading to third floor
Hardwood floors are installed in some of the rooms
Isabelle's room, with a painter in her closet
The color doesn't show well here, but her ceiling is dark turquoise and her walls are a very pale turquoise.
Cameron's bathroom
Cameron's bedroom
Standing outside of Cameron's bedroom door
Laundry room
Living room trim
Living room trim. Floors still need to be installed
Dining room, also awaiting floors