The dishwasher, sink and stove have yet to be installed (but are sitting on the side of the room) as the plumber needs to do that, but the electrician was woefully behind and didn't hook up power for those things There was a heated exchange this morning between Joe and the electrician and as of right now, all the electrical is complete with the exception of the outdoor light at the mudroom door (the original one I ordered had to be replaced) and the kitchen light over the island (which is supposed to be delivered today but hasn't arrived yet).
So, fingers crossed the plumber comes in the next day or two. The kids have been real troopers living without a kitchen, though perhaps they just like having more convenience food and junk than I would normally permit.
I have eight stools on order that will go with the island in the foreground.
The cabinet that sits on top of the counter (with the appliance garage) still needs crown moulding installed along the top. The opening in the cabinets is where the dishwasher will go. The sink is just to the left.
One end wall of the Butler's Pantry. So much storage!
The two sides are identical with glass cabinets on top and solid doors on bottom.
A swinging waiter's door is on order to be installed just to the left in this photo and will lead to the dining room.