The kitchen ceiling molding needed to be repainted, and that was finally completed today.  The counter tops should be here within a week and then the plumber will connect the appliances and we'll finally have a fully functional kitchen! 

The mudroom is complete with the exception of doors and drawers being installed on the five cubbies and one cabinet built-in.  Those arrive on Thursday and the painters will paint them to match what they've already done.

The second floor back porch, which had structural issues, was completely torn off last week and is being rebuilt.  Maurice finished framing it today and the windows were installed.  Two skylights should arrive by Thursday.

The electrician will be back tomorrow.  We have three more outside lights to be installed and six flood lights, plus five interior lights.

The carpet runner for both staircases will be installed on Thursday.  

We're still waiting for the frameless shower doors to come in for the master bathroom and the third floor bathroom. In the meantime, Isabelle has been sharing her bathroom with me, and Cameron has been sharing with Joe.

One of the painters today was back outside working on the exterior paint job.  He did the area on the front porch surrounding the front door (that will be replaced once the new one comes in).  I am 99% sure he used the wrong color gray, as it is slightly darker than the rest of the exterior that was already done.  I didn't have the energy to point it out to them today, and I actually like the "wrong" color better, so maybe to fix it, they'll decide to repaint over the correct color. 