Thursday night we marked the walls that we wanted to come down.

 |
| That black box is the servants call box, which was still operational, but is being removed. |
Friday morning the walls started coming down.
By Saturday morning, the dumpster was completely full and the 2nd floor was mostly gutted!
 |
| The Plant room with horsehair plaster removed |
 |
| Full Dumpster by 9:30 am |
 |
| Looking into Cameron's bedroom from Isabelle's bedroom |
 |
| Back staircase is removed |
 |
| Isabelle standing in the doorway of our dressing room |
 |
| Dusty footprints on the front porch |
 |
| Old Knob and Tube wiring (being removed, of course)! |
 |
| These 3 bedrooms will be combined to make two |
 |
| This will eventually be the Master Bath |
 |
| Before -- old built-ins |
 |
| After -- built-ins ripped out |
 |
| Cameron's bedroom |
 |
| Looking from the second floor, past the kitchen to the basement. |
 |
| These came in handy with all the dust! |
 |
| Back yard |