Saturday, January 30, 2016

Demolition Begins

Thursday night we marked the walls that we wanted to come down.






That black box is the servants call box, which was still operational, but is being removed.



Friday morning the walls started coming down.



By Saturday morning, the dumpster was completely full and the 2nd floor was mostly gutted!


The Plant room with horsehair plaster removed
Full Dumpster by 9:30 am

Looking into Cameron's bedroom from Isabelle's bedroom
Back staircase is removed

Isabelle standing in the doorway of our dressing room 
Dusty footprints on the front porch

Old Knob and Tube wiring (being removed, of course)!

These 3 bedrooms will be combined to make two
This will eventually be the Master Bath



Before -- old built-ins
After -- built-ins ripped out



Cameron's bedroom 
Looking from the second floor, past the kitchen to the basement.



These came in handy with all the dust!




Back yard