So, we continue to rethink the layout of the bedrooms.
Here is our latest plan:
Cameron's room (back bedroom in red) will take some of the hall space as well as the walk-in-closet that is currently in the hall.
Isabelle's room (middle two in green to be combined) will lose the existing closets so we'll build one along her back wall that abuts Cameron's room. The two small closets will be incorporated into her bathroom (blue area) to make it larger. The chimney in her room will be removed.
The back staircase has been removed. This space (yellow) along with the closet in the bedroom that abuts it (non-colored) will be combined to make a laundry room, accessible from the back hall. We'll have a larger laundry room in the basement.
The stairs to the third floor (pink) currently are narrow and have two 90 degree turns. We'll widen them and straighten them so they land in the foyer.
The current Master Bedroom will be a guest room.
The New Master Bedroom will take the existing dressing room and connect it to the front bedroom with a new wall and door. The fireplace in the dressing room will come out, but the fireplace in the bedroom will stay.
The Master Bath (yellow) will be expanded into the bedroom behind it (no color) and also take the space in the hallway where the third floor stairs are. The chimney next to the bathroom will be coming out too.
No comments:
Post a Comment